Specs & allowances
Get the sheet size right and it finishes cleanly
These are the drawings we work to. Supply the sheet at the sizes shown and it finishes cleanly.
Allowances by finish
Rope and eyelets need 50mm top and bottom, rod pockets 75mm, keder is supplied 14mm under the finished size, and liquid laminate needs 50mm on all four sides. Check the sheet against the drawing for the finish you are ordering, not a general bleed figure.
Worked examples
The same allowances with real numbers on them. Check your sheet size against these before you send it.
What we need, and the standards
What we need from you
The skins, the finished size, the edge treatment and the eyelet centres. We finish what you send — we never ask for artwork, files or proofs.
Wind loading
Temporary fencing and hoarding installations reference AS 4687:2022, whose baseline stability class is built to withstand winds at 54 km/h. Confirm the clause against your install before relying on it.
Fire performance
Exhibition and interior fabric references AS 1530.2 and AS/NZS 1530.3, with an NCC flammability index of 10 or less. We finish to the material you supply — the rating belongs to the fabric.






